Used words

I need layout of this From left to right: At a length 10.25 meters there is Room 101 (which 6 meters wide) and its right towards the east 102 which only 2 long 4.2 wide 103 east it that is 104 with metres. 6.6 high wide All factory walls are very thick reach meter or more. - Hotcell (101) open (there no door between them width opening 3 meters) Radioactive Processing (102) - Radioactive connected Waste (103) by heavy (1.8 m) HVAC (104) - The on corner factory. right left: (101) separated from Black Dressing (204) 1-meter door. 204 contains Hand-foot monitoring device special baskets for used dress. - Inside room 204 Emergency Shower (202). - the (202) has an emergency tank around 60 liters decontaminated water after having shower. Also 202 contaminated dress rack. White (201) Hand Foot Monitoring device (D8). When worker comes out 101 he must test himself foot if not contaminated then can pass 201 (the Addressing Room) through but return back have shown in 205 go Device thru D8 be cases. - For entering workers clean (non-radioactive room) access. 201 we use or/and D8. Toilet (203) located inside 201. - In racks new address should worn before accessing Infront 104 & 103 102 rooms Shipping Area (305) 305 south 102. isolated wall. 1.8-meter (double access control in/out). totally Hotcell Storage (206) Laboratory (105) both rooms 206 105 front (south of) 101. two doors row 1.8 apart. (These shipping work any other uses. The mostly closed general access) large area. However305 (door opened guard’s supervision). outside technology building Gate_1 (D0). controlled guarded guard. Corridor (308) 1.8-m (D2). area empty exit facility. Mechanical (304) wall (north-south) (east-west). (304) Service (303) (302) doors. 302 303 304 308. Cleaning Material space (301) west it 302 308 301 at 90-degree angle meaning southwest (306) north 301. 306 them 1.8 northwest 105 Control (307) side 307. controlling camera SCADA security purposes. 307 Security Level A :101102103104105 205 B: 201202203206 C: 305 304303302308301308306307 A+ B+ C = Technology Building D: 401420 lobby… rest rooms…..etc E: buildings. Office (that 401402403 ….and so on) (400) office building. 400 Guests TLD/EPD (403). (401) them. 401 Electrical (404) 1-m 404 401. Heating Cooling (402) 402 However heating cooling building On 401 Lobby Server (405) Going lobby prayer room toilets washing normal storage managers’ secretarial accounting offices. And going last Ending corridor (15) (this green glass wall). This outside. too important emergency. area separates South Green wall (accurately 201204101 102). Lobby (D10) connects stairs then this main exit/entrance whole site. 6000 meters^2 surrounding building). 1700 meters^2.
Create your own
... AND SHOP IT!

Hey, your artwork is awesome!

Did you know that you can easily buy one of these cool products?

Share your Artwork